top of page

Feb 20 FAA Permit Analysis

Updated: Mar 23, 2022

TurbineHub users have access to the most up-to-date and user QA'd FAA Permit database with complete linkage to both ACPA and USGS wind turbine databases. User can determine the areas with the newest permits and determine locations of future locations of wind farms and power infrastructure


New FAA Wind Turbine Permits Filed Feb 20, 2022




Map of Proposed Nereo GC Lincoln LLC Wind Farm owned by Starwood Energy Group

Using Turbine Hub.com








EIA Generation Data for Two most recent Starwood Energy Group Wind Farm's




Shannon Wind Farm (204.1 MW)

Clay County, Texas COD 2015
Average Monthly Capacity Factor: 37.0%
Offtaker: Hedge contract with Citigroup (204.1 MW)
General Contractor: Mortenson
Turbine Make and Model: GE 1.7-100











Map of Shannon Wind Farm owned by Starwood Energy Group

Using Turbine Hub.com





Stephens Ranch I and II (375.9 MW)

Bordan and Lynn County, Texas COD 2015
Average Monthly Capacity Factor: 38.8%
Offtaker: Target Corp (40 MW) Ercot (337.9 MW)
General Contractor: Wanzek
Turbine Make and Model: GE 1.7-100











Map of Stephens Ranch 1 & 2 Wind Farms owned by Starwood Energy Group

Using Turbine Hub.com







Nereo GC Lincoln LLC Wind Farm Economics

Using on NREL System Advisor Model (SAM)




























63 views0 comments

Kommentare


bottom of page